Resources and Modeling

Kapitanka Project

Resources

In 2019, Mine Extraction LLC conducted a preliminary geological and economic assessment of the Kapitanka chrome project. As a result, reserves of categories C1 and C2 were approved in the State Commission of Ukraine on Mineral Resources. The technical and economic report indicates the economic efficiency of developing reserves.


Category [Site] Tonnage, th. tons Grade Cr2O3, % Cr2O3, th. tons
С1 [Central] 384.0 31.4 120.7
С1 [South] 2582.1 12.87 332.2
Total: С1 2966.1 15.95 452.9
С2 [South] 521.4 22.36 116.6
Total: С12 3487.5 16.85 569.5

Wire frame model

Based on geological and analytical information, a preliminary Wireframe 3D model was created in Micromine Software – Cr2O3 by cut-off 4%.